CONCRETE PRODUCTION

CONCRETE PRODUCTION

With the work of the concrete factory, the company GK has adopted new technologies and brought production to an significant level of quality. Its capacity and the with two concrete plants increased in line with the development of the company itself. Today, in its completed process, it has two independent production of concrete. In Belgrade at Ada Huja and Kumodraž.
160 m³ PER HOUR

The total capacities of our production are 160 m³ per hour. The complete production process was followed digital operations.

Modern equipment

Our concrete factories have their own laboratory and modern equipment, the computer system doses all the ingredients of the concrete mixture according to the given recipe, and monitors all stages of production in order to obtain the required concrete brand. Dosing and adjusting the moisture content of aggregates, cements, water and additives to concrete enable us to provide a quality response to all market demands.

Quality control

Quality control is always done at the place of installation and at the point of installation to the general satisfaction of us as a manufacturer and our respected customers. With the control of the Institute for Roads of Serbia, our concrete factories issue certificates for all manufactured concrete at their factory.

GK THROUGH THE NUMBERS

0
Employees
0
Immobilized apartments
0
Constructed buildings
0
Machines and vehicles